OEM 6082 Forging Aluminum Parts For Aerospace /Automobile/Railway Vehicle/Metal Forging Part/Aluminum Forging Part
Company Profile
On May 10, 2011, Shanghai Jima Industrial Co., Ltd was established.
JIMA Aluminum mainly forging, and specialized in producing big forging parts, aluminum precision, aluminum extrusions, metal forging processing, heat treatment, etc., has formed a complete production process from raw materials to the finished product aluminum accessories chain.
Material is the life of forging. The quality of forgings has always been inseparable from the quality of materials.
Jima Aluminum relies on its technical advantages, starting from making materials, and making its own high-quality aluminum alloy forgings. From the beginning of material smelting, material composition, microstructure, performance, material deformation process, forging streamline, forging heat treatment, metallographic structure, forging surface and appearance, forging thermal stability, etc., to fully control the quality of forgings.
Has rich experience in the production and processing of high-strength and wear-resistant aluminum alloy materials and alloy steel products.
Advantage: JIMA Aluminum always holds on to some available hard aluminum alloy materials stock such as 2A12 2A14 2014 2024 2214 2218 2219 2618 2017 5083 6061 6082 7049 7075 7050 7475 7175 7A04.
There are about 175 employees and a total area of 40,000 square meters.
Has rich experience in the production and processing of high-strength and wear-resistant aluminum alloy materials and alloy steel products.
Our Advantages
1. 3 technical patents and 2 practical patents related to high-silicon aluminum alloy melting, crystallization, and forging
2. Multiple professional presses adapted to the deformation speed of high-silicon aluminum alloys
3. Two intermediate frequency heating furnaces suitable for heating weak magnetic materials such as high-silicon aluminum alloys
4. Perfect forging process of various pistons and swash plates, mold tooling technology, materials, and product inspection standards.
5. The close cooperative relationship between the company and the university scientific research is our strong technical backing.
6. We are high-tech enterprises
7. Development capability: aluminum alloy, titanium alloy, super alloy, non-ferrous metal forging development
Product Details
Material |
Aluminum Alloy 6082 |
Process |
Forging+CNC+Heat Treatment |
Surface Treatment |
Transparent, Color Anodized, Hard Anodizing, Powder Coating;
Sandblasting, Laser Carving, Silk Screening;
Nickel-Plated, Chrome, Galvanized, Silver/Gold Plating;
Black Oxide Coating, Polishing; etc... |
Manufacture Ability |
Depends on The Complexity Of Different Products And Quantities |
Experience |
Aluminum Machining Service for 12 Years |
Packaging |
Standard Export Wooden Pallets
Another Request According to Your Needs |
MOQ |
1pcs |
Sample |
Can Be Customized |
Mold |
Can Be Customized |
Lead Time |
Mold for 15-20 Days
Process for 15-20 Days
|
OEM |
Can Be Customized |
Chemical Composition of 6082 |
Alloy |
Si |
Fe |
Cu |
Mn |
Mg |
Cr |
Zn |
Ti |
Others |
Al |
Each |
Total |
6082 |
0.7-1.3 |
0.50max |
0.10max |
0.40-1.2 |
0.6-1.2 |
0.25max |
0.20max |
0.10max |
0.05max |
0.15max |
Rest |
Technical Specifications of 6082-T6
|
Physical Properties |
Metric |
English |
Comments |
Density |
2.70 g/cc |
0.0975 lb/in³ |
AA; Typical |
|
Mechanical Properties |
Metric |
English |
Comments |
Hardness, Vickers |
95 |
95 |
|
Tensile Strength, Ultimate |
290 MPa |
42100 psi |
wall thickness < 5 mm |
|
310 MPa |
45000 psi |
wall thickness > 5 mm |
Tensile Strength, Yield |
250 MPa |
36300 psi |
wall thickness < 5 mm |
|
260 MPa |
37700 psi |
wall thickness > 5 mm |
Elongation at Break |
10 % |
10 % |
|
|
Thermal Properties |
Metric |
English |
Comments |
Thermal Conductivity |
170 W/m-K |
1180 BTU-in/hr-ft²-°F |
|
Key Words
aluminum forged tube 6082
aluminum forging parts 6082
aluminum forged Rings 6082
auto aluminum parts 6082
forged aluminum alloy 6082
hot aluminum forgings 6082
cold forging car parts 6082
forging machinery components 6082
forging metal parts 6082
forging spare parts 6082
Product Show
Workshop Display
Equipment Capacity
Presses of 4000T, 3150T, 2000T, 1600T, 800T, 600T, 550T and 300T
5T, 2T, 750KG, three free forging hammers
4 axial diameters with diameters of 8M, 5M, and 2M
500 tons three-way forging press
450T double action press
400T friction press (4 sets)
630T hot forging friction press
4 heat treatment furnaces
Mesh belt heating furnace 6 sets
2 intermediate frequency furnaces
Machining CNC equipment 8 sets
Quality Inspection
Metal material universal testing machine
A complete set of equipment for material composition testing
High-power metallographic microscope (1400 times)
Low-power metallographic microscope (40 times)
3D, 2D Projection Mapper (CAM)
Brinell, Weber hardness tester
Test piece polishing machine
Analytical Balances
marking machine
Phosphor powder flaw detector
Our company has passed the quality attestation of ISO2001-9000 and has established a comprehensive ISO quality control system. Now the TS16949 management system is in process.
The quality control facilities (equipment, instruments, and talents) are available, including 3 ways measures, metallographic examination, intensity testing, material composition testing, measure inspection, etc. The academic research base has been founded in cooperation with universities and the practical training station has been set up for graduate students.
Production Procedure
After Sales
Package&Shipment
FAQ
Q1:Where can I get product&price information?
A1:Send us an inquiry e-mail, we will contact you as we receive your mail.
We will offer you the quotation within 24 working hours after receiving your detailed information. To quote you faster and more accurately,
please provide us with the following information together with your inquiry:
1) CAD or 3D Drawings
3) Material requirement
4) Surface treatment
5) Quantity (per order/month/annual)
6) Any special demands or requirements, such as packing, labels, delivery, etc.
Q2:How long can I get the sample?
A2:Depends on your specific items, within 3-7 days is required generally.
Q3: How long is the lead time for mold and machining parts?
A3: It all depends on the mold (parts) size and complexity.
Normally, the lead time is 18-20 days for molds. If the molds are very simple and not big, we can work them out within 15 days.
The lead time for machining parts is around 2-4 weeks.
For sheet metal fabrication the lead time is around 3-5 weeks.
Q4:Can we sign NDA?
A4: Sure. We never divulge customers' information to anyone else. we will keep your drawing well and not release it to others without your permission.
Q5: Is it possible to know how are my products going on without visiting your factory?
A5: We will offer a detailed production schedule and send weekly reports with digital pictures and videos which show the machining or the plastic injection progress.